This project includes construction on a raw water intake structure in the fast-moving Holston River and Pump Station on land with a 60-foot-deep wet well. This project’s challenges were the varying soil conditions, which consisted of very loose soils to solid rock, all of which were encountered in the deep pump station excavation.