mbk_name

Lake Marion Water Treatment System Santee, SC

This new 8 MGD membrane water treatment system is expandable to 12 MGD. The scope of work included construction of a full-capacity raw-water pump station, clear wells, high-service pumping station, membrane building, site pumping, electrical control building, sludge facility, raw water intake structure, and 54-inch raw water intake line extending 1500 linear feet into Lake Marion.

Now, How Can We Help? Put Us to Work.

We’ve told you what we can do, now let’s start building. Whether you’re interested in starting a project or want to join our team, click below to connect with us.

Talk to Us Join Us