Grove Creek Pump Station Piedmont, SC

This project consisted of the construction of a new 6 MGD effluent pump station at the Grove Creek WWTP, as well as a new reinforced concrete cascade aerator structure adjacent to the Saluda River and approximately 220 linear feet of force main. It also required miscellaneous piping and valves, electrical switchgear, motor control centers, and variable-frequency drives, as well as instrumentation and control hardware and software, power and control conduit, and wiring.