Glen Raven Mills Anderson, SC

M. B. Kahn was selected for this fast-track delivery of a new manufacturing and distribution center in Anderson, SC. The facility features a 250,000 SF air-conditioned high bay warehouse space with 31 truck dock positions, plus another 241,000 SF of manufacturing space. The manufacturing space includes individual bays for six lines of manufacturing equipment with a full height precast concrete separation wall between each line. The building features a fully-sprinklered ESFR system and is constructed with load-bearing precast walls and a structural steel frame. Extensive electrical work required two 4000 amp transformers and main panel boards to separate the building infrastructure and process equipment loads.

Now, How Can We Help? Put Us to Work.

We’ve told you what we can do, now let’s start building. Whether you’re interested in starting a project or want to join our team, click below to connect with us.

Talk to Us Join Us