Industrial
Bose Corporation
Electronics manufacturing, assembly and distribution facility for Wave Radio Columbia, South Carolina
| 55,000 Sq. Ft. |
Office, Engineering & Training |
| 260,000 Sq. Ft. |
Manufacturing |
| 150,000 Sq. Ft. |
Warehouse |
| 465,000 Sq. Ft. |
Total Facility |
- Structural Steel Frame
- Insulated Pre-cast and
Metal architectural wall panels
- Built-up Roof
- 25 ’ Clear Height
- 6” Floors
- 32 Truck Docks
Fruit of the Loom
Palmetto Distribution Center Summerville, SC
| 7,350 Sq. Ft. |
Office Areas |
| 30,000 Sq. Ft. |
Sorting / Packaging |
| 312,650 Sq. Ft. |
Warehouse Operations |
| 350,000 Sq. Ft. |
Total Facility |
- Tilt-up Concrete Structure
- Membrane Roof System
- 75 Fully Equipped
Truck Docks
- 35’6” Clear Height
- 7” Floor Slabs
Duration: 11 months design/build
John Deere and Company
John Deere Vehicle Group, Utility Vehicle Manufacturing & Engineering Toano, VA
| 48,364 Sq. Ft. |
Office, Engineering & Training |
| 251,122 Sq. Ft. |
Manufacturing |
| 299,486 Sq. Ft. |
Total Facility |
- Structural Steel Frame
- Insulated Pre-cast Walls
- Single-Ply Membrane Roof
- 23’ Clear Height
- 6” Floors
- 42 Truck Docks
Duration: 10 months design/build
Komatsu America
Construction equipment manufacturing facility Newberry, SC
| 12,400 Sq. Ft. |
Office, Engineering & Training |
| 191,080 Sq. Ft. |
Manufacturing |
| 203,480 Sq. Ft. |
Total Facility |
- Pre-Engineered Structure
- Insulated Wall Panels
- Standing Seam Roof (mfg area)
- Single-Ply Roof (office area)
- 6” and 8” Floors
- Multiple Truck Docks
Duration: 8 months design/build
GE Offices and Engine Combustion Testing Facility
Greenville, SC
| 54,500 Sq. Ft. |
Exterior Process Piping & Support Steel |
| 160,000 Sq. Ft. |
Manufacturing & Distribution |
| 214,500 Sq. Ft. |
Total Facility |
- Masonry veneer
- Insulated wall panels
- Full service kitchen/cafeteria
- Piping & Instrumentation
- Multiple fuel delivery systems
- IManifold exhaust system
- 10’ X 10’ common stack
- Tank Farm
- Weir tank modifications
Transaxle Manufacturing of America Corporation
Manufacturing Facility Rock Hill, SC
| 18,147 Sq. Ft. |
Office, and Training |
| 145,387 Sq. Ft. |
Manufacturing & Distribution |
| 161,534 Sq. Ft. |
Total Facility |
- Design/Build Project
- Structural Steel Frame
- Insulated Precast Concrete Walls
- Single-ply Membrane Roof
- HVAC 100%
- 6” & 10” Floors
- 10 Truck docks
|